OUTLAY FOR HEALTH SERVICES:
The Approved
Annual Plan 2009-10 in respect of Health Services Department is
Rs. 3,550.00 lakhs. As nearly as 80% of the total outlay has to
spent for salary component and Rs. 1000.00 lakhs are to be spent
for matching share of NRHM, the Department could not be able to
take other development work amply as desired.
1.
During 2009-2010, the following
works were constructed under Health Services.
a)
Type I Quarters
- 11 nos.
b)
Type II Quarters
- 2 nos.
c)
Type III Quarters
- 2 nos.
d)
Type IV Quarters -
1 no.
Construction
of Water Reservoir, Parking Area/Turning Point, Approach Road
and Flagstone Flooring.
2.
Work proposed during 2010-2011
i)
Construction of Boys’ Hostel for
Health Worker Training School at Kulikawn – 1 no.
ii)
Construction of Sub-Centre cum
Quarters - 8
nos.
iii)
Construction of Retaining Wall at
Sub-Centre and Department Complex - 2 nos.
iv)
Renovation of Sub-Centre
Clinic
- 1 no.
v)
Construction of Waiting
Shed
- 1 no.
vi)
Construction of RCC Water
Reservoir
- 1 no.
vii)
Construction of LT Line at PHC
Complex - 1
no.
B.
MALARIA CONTROL PROGRAMME:
1)
Surveillance Report:
The entire
State is targeted for surveillance where MPW are to take blood
smear of any fever cases suspected for presumptive dose which
are examined in the PHC/CHC/Hospital for diagnosis. The
Surveillance activities are as below:-
|
Year |
BSE |
POS(Malaria
cases) |
Pf |
Death |
|
2009 |
171793 |
9399 |
7387 |
119 |
|
2010 (upto May) |
77975 |
2900 |
2666 |
7 |
2)
Spray
:
For Vector
Control, the entire State is target for two (2) rounds of DDT
spray in a year. In the current year (2010), the population
coverage is 72.84% and the rooms coverage is 61.85% only.
3)
Bednet:
During
2010-11, 80000 nos. of long lasting Insecticide Treated Nets (LLIN)
are to be supplied by Government of India. Besides this, 70117
nets are to be procured from NRHM flexi pool fund which is under
process.
C.
T.B.
CONTROL PROGRAMME:
|
|
Achievement
Report (2009 -2010)
|
Year |
Sputum Positive |
Sputum Negative |
Extra Pulmonary |
Total Case |
Cured |
Per-centage |
|
2009 |
570 |
751 |
772 |
2538 |
702 |
91% |
|
2010(Jan-Mar) |
138 |
143 |
165 |
590 |
138 |
92% |
|
TOTAL |
708 |
894 |
915 |
3128 |
840 |
|
|
|
D.
NATIONAL RURAL HEALTH MISSION (NRHM):
i)
943 nos. of Accredited Social
Health Activist (ASHA) have been trained, provided with drug
kits and made functional to bring about increase in
institutional delivery, improvement in maternal and child health
and brining about better coordination between the health sector
and the community.
ii)
Village Health & Sanitation
Committee (VHSC) have been formed in all revenue villages and
Untied grant @ Rs. 10000/- for each VHSC amounting to Rs.
78,40,000/- have been sanctioned in all districts. Sub-Centre
(SC) Untied grant @ Rs. 10000/- per SC for all 366 SC amounting
to Rs. 36,60,00/- have been released and SC annual maintenance
fund of Rs. 10000/- for 236 SC have been released for their
utilization to bring about improvement at village level.
iii)
Rogi Kalyan Samiti, a patient
welfare society is being actively undertaken. All district
hospitals and CHC have been registered and registration for 90%
PHC have been completed. Funds have been released and are being
made functional to bring about improvement for the patients and
the functioning of the hospitals. PHC and CHC untied funds @ Rs.
25000/- per PHC and Rs. 50000/- per CH have been released to be
utilized for the welfare of the rural hospitals. Annual
maintenance grant for 51 PHC @ Rs. 50,000/- have also been
accorded to the needful PHC for their physical improvement and
Annual Maintenance grant for 5 CHC @ Rs. 50,000/-.
iv)
Upgradation of physical
infrastructure: 6 district hospitals namely Saiha, Lawngtlai,
Lunglei, Kolasib, Mamit and Serchhip project has been taken up
for upgradation under NRHM. Civil Hospital, Aizawl and Champhai
District Hospital upgradation project initial stage has began.
Infrastructure upgradation of six CHC – viz., Vairengte,
Sakawrdai, Saitual, Ngopa, Thenzawl and Chawngte CHC upgradation
completed. Reconstructed upgradation of another 3 CHC viz.,
Biate CHC, Hnahthial CHC and Kawrthah CHC is also taken up
during 2008-2009. Construction of Staff Quarters in 5 CHC is
taken up during 2009-10. Construction of 1 type III Quarter at
Saitual CHC, 1 type III Quarter at Vairengte CHC, 1 type III
Quarter at Tlabung SDH will be taken up during 2010-11.
Reconstruction of eight (8) Primary Health Centre was undertaken
during 2008-2009 and reconstruction of another 4 PHC is being
undertaken at Eat Lungdar, Borapansuri, Khawhai and Phuaibuang
during 2009-10.
v)
A total of 130 Sub-Centres,
Sub-Centre cum quarters reconstruction has been completed
already, 50 more were taken up during 2009-2010. Four (4) new
construction of sub-centre was also undertaken during 2008-09
for the politically displaced BRU refugees. These are located
as follows:
Three (Nalzawl,
New Eden and Damdiai) in Mamit District. One (Putlungasih) in
Lunglei district.
Construction of 17 Sub-Centres and 14 Sub-Centre Quarters will
be taken up during 2010-11.
vi)
17 Ambulances has been procured for
Patient Referral system and distributed to 8 District Hospitals
and 9 CHC. Another 40 Ambulances were also procured for
distribution to the thirty two 24x7 PHC. These 402 PHCs are
also supplied with a back-up generator for improving the quality
of services especially delivery and maternal and child health.
During 2010-11, it is planned to upgrade one Lungdai PHC into
24x7 PHC by providing Ambulance and Back-up Generator.
vii)
Procurements to be taken up during
2010-11
Procurement of
5(five) 50 MA X-Ray machine.
Procurement of
20 Radiant warmer.
Procurement of
15 OT Light Shadow less.
Procurement of
30 suction apparatus.
Procurement of
20 photo therapy unit.
Procurement of
20 labour table.
Procurement of
2 Backup Generator for Lawngtlai DH & Mamit DH.
Procurement of
1 Ambulance for Lungdai PHC.
Procurement of
1 Backup Generator for Lungdai PHC.
E.
REPRODUCTIVE AND CHILD HEALTH:
|
Sl.No |
|
2008-09 |
2009-10 |
|
1. |
Total pregnant women registered for
Ante-Natal Care (ANC) |
26067 |
32438 |
|
2. |
Percentage of Pregnant Women having 3
ANC |
73 |
70 |
|
3. |
Total Delivery |
20244 |
23834 |
|
4. |
Percentage of Institutional Delivery |
75 |
76 |
|
5. |
Percentage of Safe Delivery |
85 |
86 |
|
6. |
Post-Partum Care within 48 hours of
delivery |
35 |
56 |
|
7. |
Maternal Mortality Ratio |
30 |
50 |
|
8. |
Percentage of fuly immunized children
below 1year
( % against Annual Plan Target of EPI
) |
85 |
89 |
|
9. |
Infant Mortality Rate |
30 |
29 |
|
10. |
Availability of Health Institutions |
|
|
|
|
a) No. of Sub-Centres |
370 |
370 |
|
|
b) No. of Primary Health Centres |
57 |
57 |
|
|
c) No. of Community Health Centres |
12 |
12 |
JSY beneficiaries :
|
Year |
Institutional Deliveries |
Home
deliveries |
Total |
|
2009-10 |
13659 |
606 |
14365 |
F.
SCHOOL
HEALTH PROGRAMME
Activities
under School Health:-
i)
No. of School visit - 776
ii)
No. of children examined - 42676
iii)
No. of Eye problem - 4283
G.
NURSING PROGRAMME :
1)
26 nos. of Nursing Students passed
out B.Sc. (N) Course for the first time from Mizoram College of
Nursing in the year 2009.
2)
20 nos. of Nursing Students passed
out GNM from Lunglei Nursing College.
3)
38 nos. of Health Worker Students
passed out from Health Worker Training School, Kulikawn.
H.
AYUSH:
1)
Construction of AYUSH Hospital (10 bedded) in all District
Hospitals is completed.
2) 20
Medical Officers (AYUSH) recruited on Contractual Basis.
H.
BLINDNESS:
1)
During 2009-2010, 2560 nos. of Cataract Operation was performed.
2) In
the year 2009-2010, 46623 nos. of eye screening was done for
School children and out of this 5202 nos. of children had eye
problem, 2828 nos. of poor children were given free spectacles.
3) Eye
Bank was established at Civil Hospital, Aizawl.
4)
Construction of Eye Ward and Operation Theatres at Aizawl,
Serchhip and Lunglei.
I.
LEPROSY:
During 2009-2010, 8 nos. of Leprosy cases was detected and the
total number of Leprosy patients was 10 nos.
J.
INTEGRATED DISEASES SURVEILLANCE PROJECT (IDSP):
1)
Sensitization Workshop on Avian
Influenza (H5N1) for Health Personnel + NGOs & Prominent
Citizens was conducted throughout all District Headquarters and
at Vairengte.
2)
Training of Rapid Response Team on
Swine Flu (H1N1) during 23rd – 25th
September, 2009 with EMR, Govt. of India, Delhi with 6 members
from State Headquarters and 4 members each from all Districts.
3)
1,14,872 persons were screened for
H1N1 and 20 persons suspected were given treatment of Tamiflu,
72 H1N1 samples sent to NICED, Kolkata for testing and 4 cases
positive H1N1 discovered.
K.
DRUGS CONSTROL ADMINISTRATION:
i)
No. of Inspection of Drugs
Store - 1492
ii)
Suspension of Drugs Licence
- 35
iii)
No. of Show cause notice
served - 31
iv)
Cancellation of Drugs Licence
- 25
L.
MASS EDUCATION AND MEDIA:
Achievement of IEC in Mizoram during the year 2008-2009 &
2009-2010
|
Sl. No. |
Particulars |
2008-2009 |
2009-2010 |
|
1. |
Printing of
Hriselna Magazine, 10,000 copies, increased 5000 copies
due to public demand |
12,000 copies |
17,000 copies |
|
2. |
Display
advertisement |
90 |
120 |
|
3. |
Prepared 20
notes of regular Health talk for Rural Health programme
at AIR (Aizawl Station) per months |
240 |
240 |
|
4. |
Prepared 14
notes of regular Health talk for In Damtlang em? at AIR
(Aizawl Station) per months |
168 |
168 |
|
5. |
Health
Awareness Campaign |
48 |
48 |
|
6. |
Printing of
Booklets / Leaflets |
2,50,000 |
2,80,000 |
|
7. |
Press Release
20 nos per month for public health education |
240 |
270 |
|
8. |
O.T. Cap &
Mini-Publicity Campaign for Rural Health 7 nos. per
month |
120 |
110 |
|
9. |
State &
District Level Seminar conducted |
4 |
6 |
|
10. |
Live Phone in
through AIR, Aizawl & DDK for General Public Health
Awareness |
4 |
3 |
|
11. |
Outreach
programme for Community Health Clinic at various village |
8 |
10 |
|
12. |
New Hoarding &
reprinted put up |
11 |
13 |
|
13. |
Observation of
important days |
4 |
4 |
Back |